Skip to content

Roadmap

Konverge is in beta on the web, with iPhone and Android apps coming soon. This page says what is live, what the beta is for, what has to be true before a public launch, and what comes after. It is the same plan we run the project from, without the internal ticket numbers.

Tiers[Supported][Supported at launch][Early access][Beta]

Four stages

Dates are deliberately absent. The sequence is fixed; the pace depends on what pilots find.

  1. 01[Now]

    Live today

    Web · beta

    • 1.01Documents & drawings: fast drawing viewer, markup, pins, versions, QR links
    • 1.02Field operations: capture, daily logs, snags, inspections, incidents, notes, photos, timesheets
    • 1.03Projects: eight-tab hub, Gantt with critical path, team, closeout
    • 1.04AI copilot: ask, draft-and-confirm, photo to record, search
    • 1.05Messages, contacts, roles and permissions, company switching
    • 1.06Portfolio reports
    • 1.07Early access: estimates, finance, progress billing, procurement, leads & bids, equipment
    • 1.08In-app feedback, content reporting and moderation
    • 1.09The office on the web: estimates, change orders, finance, reports, documents and drawings (drawing-set upload included), site records, team, client portal and data export
    • 1.10Sign-in by email or phone code
  2. 02

    During the beta

    Next 6–8 weeks

    • 2.01Three to five pilot contractors, staggered; weekly calls
    • 2.02Billing: per-company plans with a 14-day free trial (card at sign-up); card on the web, or invoiced
    • 2.03iPhone and Android apps in the App Store and Google Play, with biometric app lock
    • 2.04Change orders promoted to the supported tier (approvals enforced for every user, full testing on phones)
    • 2.05Voice capture proven on site hardware and un-badged
    • 2.06Documents: workflow approver picker and badge polish from pilot feedback
    • 2.07Two-step verification with an authenticator app on web sign-in
    • 2.08Fixes from whatever the first site finds
  3. 03

    Public launch gates

    All must pass

    • 3.01Beta exit: three pilots ran a real project daily, crash-free ≥ 99.5%, at least one pilot says it would pay
    • 3.02Per-company AI cost cap live
    • 3.03Storage posture ratified in writing
    • 3.04Load test re-run at 300–500 concurrent users
    • 3.05Backup restore drill performed
    • 3.06Service-layer tests on every supported module
    • 3.07Per-company currency and format handling (UK + US)
    • 3.08Over-the-air update channel so fixes do not wait on store review
  4. 04

    After launch

    Default order, revisable on signal

    • 4.01Promotion ladder: progress billing and invoices → estimates → procurement → leads & bids → equipment
    • 4.02Accounting: QuickBooks Online and Xero export (in progress; not yet connectable)
    • 4.03Client portal in the phone apps (the web portal is live: quotes, change orders and payment applications approved online)
    • 4.04A public API and webhooks
    • 4.05AI memory: the copilot learns from your corrections
    • 4.06Localisation beyond English (Spanish is bundled; more languages on demand)

The changelog records what actually shipped, with dates.

[A,1][F,1][A,6][F,6]

Pilots decide what gets promoted first. If you run projects and want in early, say so.